Infrastructure · Capacity & scaling

See tomorrow’s capacity problems today.

Understand current resource consumption, identify trends, anticipate growth and plan expansion before performance becomes a problem. Office Unbound is being designed to combine infrastructure analytics with capacity recommendations an operator can act on.

Project status Planned. The Infrastructure Control Server is in the roadmap’s Infrastructure Operations track; nothing described here has been built.

Why capacity needs its own tools

Productivity platforms grow unevenly. Mail and file storage grow every day; meeting and document-editing load arrives in peaks; a new tenant can double the size of a deployment in a week. A host that looks comfortable on average can still run out of memory on a Monday morning, and storage that grows slowly can still fill a pool before anyone checks.

The ICS already collects the metrics needed to see this coming. The capacity features are intended to turn that history into trends, forecasts and specific recommendations, and to carry out approved changes safely.

Proposed interface concept Not released · example data · subject to change

Headroom, host-failure tolerance, growth with stated assumptions, a tenant what-if and a scaling proposal that waits for approval. Open this concept

Monitoring and analytics

What the capacity planner is designed to measure and keep as history.

  • Resources

    CPU utilization, RAM usage, storage utilization and growth rates, network throughput, disk performance.

  • Workloads

    Service-level resource usage, VM and container utilization, resource contention between workloads.

  • Patterns

    Historical trends, peak usage and performance baselines, so a busy hour is compared with normal for that hour.

  • Tenants

    Growth projections per tenant, so an MSP can see which customers are driving demand.

  • Protection

    Backup capacity, and how much of it future growth will consume.

  • Redundancy headroom

    Whether the remaining hosts could absorb the workload if one failed.

Questions it is designed to answer

  1. When will storage run out?

  2. How many more users can this environment support?

  3. When will more RAM be needed?

  4. When should another hypervisor be added?

  5. Which services use the most resources?

  6. Is the current infrastructure overprovisioned?

  7. Can the environment survive a host failure?

  8. Can another tenant be added safely?

  9. Which workloads need more capacity?

  10. What infrastructure will be needed in six months?

How forecasts are meant to be made

A forecast is only as good as its inputs. Each one is designed to be built from metrics the deployment has actually collected, to state the assumptions it rests on, and to show a range rather than a single date.

  • Collected metrics. Forecasts use this deployment’s own history, not generic sizing tables. A new deployment with little history gets wide ranges, and is told so.
  • Explicit assumptions. Growth rate, the period it was measured over, planned tenant additions and seasonal patterns are shown with the forecast and can be changed.
  • Stated uncertainty. “Storage is projected to fill between two dates, assuming current growth” rather than one confident day.
Forecasts are estimates

Trends change: a migration, a new customer or a change in how people work can make last quarter’s growth rate irrelevant. Forecasts are planning aids for an administrator, not commitments about performance.

Scaling recommendations

Specific changes, each with the reason and the data behind it.

  • Concept An idea or design direction; not yet committed to the roadmap
  • Under evaluation Being assessed; no choice made yet
  • Planned Committed to the roadmap; work not started
  • In development Being worked on now
  • Implemented Code exists in a public repository
  • Tested Passed published tests
  • Production-ready Shipped in a supported release
Planned scaling recommendations
CapabilityWhat it meansStatus
Resize VMsMemory and CPU allocation adjustments, up for constrained workloads and down for overprovisioned ones.Planned
Expand storageWhen and where to add storage, based on growth per pool.Planned
Balance workloadsVM migrations between hosts to relieve contention, within failure-domain rules.Planned
Add a hypervisorWhen the cluster will need another host, including to keep redundancy headroom.Planned
Replicate servicesAdditional instances for services that support horizontal scaling.Planned
Plan redundancyWhere a single failure would take out a service, and what would prevent it.Planned
Assess a new tenantWhether a new customer’s expected size fits the current environment, before it is provisioned.Planned
What-if simulationModel a change, such as adding a block of users, losing a host or moving a tenant, and see the projected effect before committing to it.Planned

Controlled scaling implementation

Recommendations are only half the job. The ICS is designed to carry out approved infrastructure changes through supported hypervisor and orchestration APIs, the same way it carries out recovery actions: only with authorization, only after checks, and with every step recorded.

Before a change runs, the ICS is designed to confirm that it can be done safely. If any check fails, the change does not run and the reason is shown.

Horizontal scaling applies only to services that support it. Some components scale by adding instances; others only by giving one instance more resources. Which is which is part of the component evaluation.

  • Available capacity

    The target host or pool has room for the change, with headroom left.

  • Storage consistency

    Storage is healthy and replicated as expected before data is moved or resized.

  • Failure domains

    The change does not place redundant services on the same host or storage.

  • Workload compatibility

    The workload supports the operation, such as live migration or adding an instance.

  • Rollback feasibility

    There is a way back if the change does not work as expected.

  • Approval

    An administrator approves, unless the operation is one the operator has explicitly allowed to run under policy.

Planning capacity for customers?

If you size and grow environments for others, tell the project which forecasts you need most. That shapes the first analytics features.